|
|
Project consisted of pulverization of existing street and removal of curb and gutter. Removal of excess dirt material from sub-grade. Installation of new base material. Installation of curb, gutter, sidewalk, driveway approaches, and curb ramps. Installation of asphalt paving. Completion date:1/98 Estimated Contract Value: $185,000 |
| Click for full image | |
|
|
|
![]() |
Project consisted of pulverization of existing street and removal of curb and gutter. Removal of excess dirt material from sub-grade. Installation of new base material. Installation of curb, gutter, sidewalk, driveway approaches, and curb ramps. Installation of asphalt paving. Completion date:11/97 Estimated Contract Value:$450,000 |
|
|
|
![]() |
Bolsa
Ave. Improvements at McDonnell Centre, Project consisted of pulverization of existing street and removal of curb and gutter. Removal of excess dirt material from sub-grade. Installation of new base material. Installation of curb, gutter, sidewalk, driveway approaches, and curb ramps. Installation of asphalt paving. Completion date:12/96 Estimated Contract Value:$280,000 |
|
|
|
|
Project
consisted of approximately 5 acres of offsite and onsite grading and paving.
|
|
| Click for full image | |
|
|
|
![]() |
Project consisted of onsite grading and paving of parking lot.
Completion date: 9/97 Estimated Contract Value:$90,000 |
|
|
|
|
|
Project
consisted of cold planing, installation of "Petromat" paving fabric, and
paving at various locations. Hot rubberized cracksealing, sealcoating,
and striping of the entire facility. Completion date: 12/97 Estimated Contract Value: $90,000 |
| Click for full image | |
|
|
|